Instalation CryoSpace Activ Hybrid

< Back

Instalation CryoSpace Activ Hybrid


  1. Place the condensing unit in the place of connection to the device. Cryosapce and condensing unit should be disconnected from the supply.
  2. Screw the gas connectors together.
  3. Connect Cryospace and condensing unit. The plug on the cable has the words “condensing unit”, this plug must be connected to the unit. Second plug must be connecten to Cryospace.
  4. Supply the device. Log in as a serviceLogin
    • Login: JBG
    • Password: JBG2
  5. Follow the instruction on the screen.

STEP 1


Valves B and C must be close CLOSE]. Open „Settings” – “Connecting unit” and confirm. Follow the instruction on the screen.

STEP 2


Checking status. Valve A must be open [OPEN].

STEP 3


Confirm to screw the unit and connect the power plug.

STEP 4


Waiting for finish automation installation. Vacuum: 15min. Checking vacuum: 5min.

If a leak occurs, the window will return to the first step, then check the screwing of gas connectors and start installation again. The correct pressure will automatically open next window with step 5.

STEP 5


Close valve A [CLOSE].

STEP 6


Open valves B and C [OPEN].

 

Last Updated On October 03, 2018